Project 4 is moving along rather smoothly. After Rachel and I designed and developed master pages for both the document and the presentation, we divvied up work between other members in our group and began working, each taking a section. Here is what I have done so far for my section:
Sunday, April 14, 2013
In Progress: Project 3 & 4
Project 3 is coming along slowly but surely. Designing a map of Des Moines area bike routes and trails was much more complicated than I anticipated. That aspect is definitely still in the works. However, I have narrowed down typefaces and colors for the calendar aspect of my design.
Project 4 is moving along rather smoothly. After Rachel and I designed and developed master pages for both the document and the presentation, we divvied up work between other members in our group and began working, each taking a section. Here is what I have done so far for my section:
Project 4 is moving along rather smoothly. After Rachel and I designed and developed master pages for both the document and the presentation, we divvied up work between other members in our group and began working, each taking a section. Here is what I have done so far for my section:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment